Border
2 invoiced KFC restaurant sites in Laredo for KBP Foods — the programme came back to this city.
Request a Laredo EstimateStore numbers and job values as invoiced. Nothing here is an estimate or a projection.
2 sites, $58,573 invoiced in Laredo alone. The programme ran to 23 sites across 19 Texas cities on one contract, with one point of contact and one invoice per location.
Border sites sit on caliche and gravelly subgrade that compacts well when it is dry and behaves very differently when it is not. The work is in the moisture control during placement, not in the spec sheet.
Extreme summer surface temperatures with a wide day-to-night swing. That cycling is hard on joints and on any seam that was not rolled while the mat was still hot.